  • Supervision of construction works as part of the inspection commissioned by the Ministry of Public Works (MOP). The project involved pavement replacement along the length of the La Pólvola road, with the exception of the viaducts and tunnels along the route. The new surface was to be of 23 cm thick concrete slabs complete with structural fiber, installed on top of the existing pavement. The latter was to be milled by between 1 and 5 cm, leaving a minimum of 6 cm remaining.